{"id":1673,"date":"2021-05-25T00:24:16","date_gmt":"2021-05-25T04:24:16","guid":{"rendered":"https:\/\/www.activepw.org\/?p=1673"},"modified":"2021-06-02T16:27:14","modified_gmt":"2021-06-02T20:27:14","slug":"manassas-motorist-first-sudley-road-third-lane-project-and-its-awful-public-process","status":"publish","type":"post","link":"https:\/\/www.activepw.org\/?p=1673","title":{"rendered":"Manassas&#8217; Motorist-First Sudley Road Third Lane Project and Its Awful Public Process"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-1675 aligncenter\" src=\"https:\/\/www.activepw.org\/wp-content\/uploads\/Sudley-Rd-Third-Lane-Project-Map-300x179.jpg\" alt=\"\" width=\"600\" height=\"358\" srcset=\"https:\/\/www.activepw.org\/wp-content\/uploads\/Sudley-Rd-Third-Lane-Project-Map-300x179.jpg 300w, https:\/\/www.activepw.org\/wp-content\/uploads\/Sudley-Rd-Third-Lane-Project-Map-676x402.jpg 676w, https:\/\/www.activepw.org\/wp-content\/uploads\/Sudley-Rd-Third-Lane-Project-Map.jpg 855w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>The City of Manassas&#8217; upcoming northbound-only <a href=\"https:\/\/www.manassasva.gov\/public_works\/sudley_road_third_lane.php\" target=\"_blank\" rel=\"noopener\">Sudley Road Third Lane Project<\/a> illustrates how the <a href=\"https:\/\/www.manassasva.gov\/connect\/mayor_and_council\/index.php\" target=\"_blank\" rel=\"noopener\">Manassas City Council<\/a> has, over many years, allowed pro-motoring locality Engineering\u00a0 and Public Works staff to avoid meaningful public involvement in transportation project development to advance a dismal, anti-pedestrian, largely unnecessary, and counterproductive arterial-road-widening project through a healthcare-focused regionally significant activity center planned for mixed-use, pedestrian-friendly redevelopment (as described on pp. 56-58 <a href=\"https:\/\/www.manassasva.gov\/Community%20Development\/Comp%20Plan\/Chapter%203%20-%20Land%20Use%20web.pdf\" target=\"_blank\" rel=\"noopener\">in the City&#8217;s Comprehensive Plan<\/a>).<\/p>\n<p><a href=\"https:\/\/www.manassasva.gov\/Engineering\/Sudley%20third%20lane\/Sudley%20Road%20Presentation%202021-05-17.pdf\" target=\"_blank\" rel=\"noopener\"><strong>View the City&#8217;s project design presentation, <\/strong><\/a>which was finally linked from the <a href=\"https:\/\/www.manassasva.gov\/public_works\/sudley_road_third_lane.php\" target=\"_blank\" rel=\"noopener\">project webpage<\/a> on May 28, 2021, one workday before the June 1 project<a href=\"https:\/\/form.jotform.com\/211095982766164\" target=\"_blank\" rel=\"noopener\"> public comment<\/a> deadline.\u00a0 <a href=\"https:\/\/www.google.com\/maps\/place\/Novant+Health+UVA+Prince+William+Medical+Center\/@38.7672467,-77.4961681,15z\/data=!3m1!5s0x89b65c63bbe36943:0x3ffc73e3af12e7a4!4m5!3m4!1s0x89b65c6161147a75:0x959538e9448d50e0!8m2!3d38.7672467!4d-77.4874134\" target=\"_blank\" rel=\"noopener\">View the project area on Google Maps<\/a>.<\/p>\n<p>The design of this relatively modest <a href=\"http:\/\/syip.virginiadot.org\/Pages\/lineitemDetails.aspx?syp_scenario_id=273&amp;line_item_id=1443683\" target=\"_blank\" rel=\"noopener\">$8.4 million project<\/a>\u2014despite providing some much-needed and long-delayed pedestrian facilities\u2014fails to make Manassas more livable, equitable, or sustainable, because it prioritizes excessively fast travel in motor vehicles over safe, pleasant, and effective non-auto mobility.<\/p>\n<p>Moreover, the chronic lack of timely and impactful public involvement throughout the multi-year development of this City-led transportation project has squandered a valuable opportunity to help transform the City&#8217;s <strong>Sudley Medical character area<\/strong> into an attractive, mixed-use, walkable, healthcare-focused activity center, by ignoring or undermining the objectives, focus priorities, and design principles outlined on <a href=\"https:\/\/www.manassasva.gov\/Community%20Development\/Comp%20Plan\/Chapter%203%20-%20Land%20Use%20web.pdf\" target=\"_blank\" rel=\"noopener\">pages 56-58 in the Land Use chapter of the <em>Manassas 2040<\/em> Comprehensive Plan<\/a>.<\/p>\n<h4 style=\"text-align: center;\"><strong>An Abysmal Public Process<\/strong><\/h4>\n<p>Although this project has been listed with a nutshell description in the City\u2019s <a href=\"https:\/\/www.manassasva.gov\/finance\/budget_division\/capital_improvement_program.php#\" target=\"_blank\" rel=\"noopener\">Capital Improvement Program<\/a> (as project #T-015) since 2000, staff work apparently did not begin in earnest until the fall of 2015, when the project was submitted for the Commonwealth Transportation Board\u2019s first round of SMART Scale (HB 2) funding (for FY 2017).\u00a0 On November 23, 2015, the Manassas City Council adopted a <a href=\"https:\/\/legistarweb-production.s3.amazonaws.com\/uploads\/attachment\/pdf\/128135\/Resolution___R-2016-17.pdf\" target=\"_blank\" rel=\"noopener\">pair of resolutions<\/a> to support the City\u2019s transportation funding applications, but there was no prior public speaking opportunity.<\/p>\n<p>Ideally, City staff should have begun engaging the community to discuss the scope of this long-planned transportation project at least six to 12 months before applying for any outside funding.\u00a0 However, the City had no transportation planner at that time, and the City departments responsible for Community Development and Planning and for Public Works and Engineering were siloed at separate locations.<\/p>\n<p>In short, <strong>no community meeting or public hearing was <em>ever<\/em> held to discuss the scope, nature, or particulars of this project until City staff finally held a virtual public information meeting on <a href=\"https:\/\/www.manassasva.gov\/public_works\/sudley_road_third_lane.php\" target=\"_blank\" rel=\"noopener\">Tuesday, May 18, 2021<\/a>, when preliminary engineering was more than 90% complete.\u00a0 <\/strong>Had the City held such community conversations early and throughout project development, the scope and proposed design of this project would likely have been substantially better.<strong><br \/>\n<\/strong><\/p>\n<p>Originally, the southern terminus of this project was Dorsey Circle, the roadway widening was limited to the short segment between Rolling Road and Godwin Drive, and the scope included undergrounding the NOVEC electric wires on the east side of Sudley Road.\u00a0 However, in mid-2017, staff determined that the electrical undergrounding would cost more than extending the road widening farther south, to add a third northbound lane to Sudley Road between Grant Avenue and Stonewall Road.<\/p>\n<p>The northbound roadway between Stonewall Road and Rolling Road has long had an essentially continuous right-turn-only lane, as well as two straight-through-only travel lanes, and was never proposed for any additional widening (or sidewalk improvements).<\/p>\n<div id=\"attachment_1692\" style=\"width: 610px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-1692\" class=\" wp-image-1692\" src=\"https:\/\/www.activepw.org\/wp-content\/uploads\/NB-Sudley-Road-near-Hospital-300x294.png\" alt=\"\" width=\"600\" height=\"588\" srcset=\"https:\/\/www.activepw.org\/wp-content\/uploads\/NB-Sudley-Road-near-Hospital-300x294.png 300w, https:\/\/www.activepw.org\/wp-content\/uploads\/NB-Sudley-Road-near-Hospital.png 491w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><p id=\"caption-attachment-1692\" class=\"wp-caption-text\"><em>Google Streetview of Northbound Sudley Road across fron Novant\/UVA Hospital.\u00a0 Except to allow through traffic in the rightmost lane, the Third Lane Project will not alter this road segment. The narrow, 4-foot sidewalk is only 2 feet from the roadway and without shade, street lights, or street furniture (except at this single, mid-block bus stop).\u00a0 The current continuous right-turn-only lane helps buffer the sidewalk from high-speed traffic and also provides bicycle access for traffic-tolerant bicyclists.\u00a0 The proposed Sudley Road Third Lane Project would essentially extend this pedestrian-hostile street design with three northbound travel lanes the full distance from Grant Avenue to Godwin Drive.<br \/><\/em><\/p><\/div>\n<p>On December 11, 2017, City staff placed a <a href=\"https:\/\/potomaclocal.com\/2017\/12\/18\/manassas-leaders-approve-plan-to-add-longer-third-traffic-lane\/\" target=\"_blank\" rel=\"noopener\"><strong>change-of-scope request for this project on the consent agenda for the Manassas City Council<\/strong><\/a>.\u00a0 The project was<a href=\"https:\/\/legistarweb-production.s3.amazonaws.com\/uploads\/attachment\/pdf\/129614\/Sudley_Road_Scope_Change_Graphic.pdf\" target=\"_blank\" rel=\"noopener\"> re-scoped to create a continuous third northbound lane from Grant Avenue to Godwin Dr<\/a> and to abandon all electric wire undergrounding.\u00a0 Again, there was no public comment opportunity, community meeting, or public hearing to discuss the re-scoped project, and the <a href=\"https:\/\/legistarweb-production.s3.amazonaws.com\/uploads\/attachment\/pdf\/131163\/R-2018-15.pdf\" target=\"_blank\" rel=\"noopener\">Council\u2019s resolution approving the re-scoping falsely stated in part<\/a><a href=\"https:\/\/legistarweb-production.s3.amazonaws.com\/uploads\/attachment\/pdf\/131163\/R-2018-15.pdf\" target=\"_blank\" rel=\"noopener\">:<\/a> <strong><em>&#8220;WHEREAS, the public involvement process is complete and all resulting comments have been addressed, as needed<\/em><\/strong><strong>;&#8221;<\/strong><\/p>\n<p>In February 2021, the project was quietly re-scoped again to add two extra turn lanes on Sudley Road at Godwin Drive for Prince William County\u2019s proposed four-lane Route 28 Bypass in the Flat Branch floodplain.\u00a0 To accommodate the proposed Bypass, Prince William County has transferred $1.03 million in surplus federal highway (RSTP) funds from a recently completed highway project to the City\u2019s Sudley Road project (<a href=\"https:\/\/thenovaauthority.org\/wp-content\/uploads\/2021\/03\/February-11-2021-Authority-Meeting-Packet_as-revised.pdf\" target=\"_blank\" rel=\"noopener\">see pp. 39-43 here<\/a>).\u00a0 This time, not only was there no public comment opportunity, community meeting, or public hearing to discuss these project changes; the changes were not even mentioned on a City Council agenda.\u00a0 Instead, the fund transfer was discussed and approved at the February 11, 2021 meeting of the Northern Virginia Transportation Authority, with no public comment opportunity.<strong><em><br \/>\n<\/em><\/strong><\/p>\n<p><strong>The Manassas City Council, as the policy-setting body for the City, has both the authority and a public duty to ensure early, continuous, robust, and impactful public involvement in the development of all City-led transportation projects going forward.<\/strong><\/p>\n<h4 style=\"text-align: center;\"><strong>A Wasteful, Motorist-First, Pedestrian-Hostile,-and Bicyclist-Unfriendly Street Design<\/strong><\/h4>\n<p><strong>1) Sudley Road already has more than ample capacity for motor vehicles and lacks a traffic congestion problem that warrants a third northbound travel lane.\u00a0 <\/strong><\/p>\n<p>This two-way Sudley Road segment carries only <a href=\"https:\/\/www.virginiadot.org\/info\/resources\/Traffic_2019\/AADT_155_Manassas_2019.pdf\" target=\"_blank\" rel=\"noopener\">28,000 vehicles\/day<\/a>, a volume well accommodated with only four travel lanes, especially with dedicated left and right turn lanes at every intersection.\u00a0 By contrast,\u00a0 nearby Sudley Road in Prince William County carries <a href=\"https:\/\/www.virginiadot.org\/info\/resources\/Traffic_2019\/AADT_076_PrinceWilliam_2019.pdf\" target=\"_blank\" rel=\"noopener\">38,000 vehicles\/day<\/a> north of Godwin Drive and <a href=\"https:\/\/www.virginiadot.org\/info\/resources\/Traffic_2019\/AADT_076_PrinceWilliam_2019.pdf\" target=\"_blank\" rel=\"noopener\">50,000 vehicles\/day<\/a> north of Sudley Manor Drive.\u00a0 For comparison, Grant Avenue by Georgetown South, which the City seeks to squeeze into only two travel lanes, carries <a href=\"https:\/\/www.virginiadot.org\/info\/resources\/Traffic_2019\/AADT_155_Manassas_2019.pdf\" target=\"_blank\" rel=\"noopener\">16,000 vehicles\/day<\/a>, and southbound Sudley Road has only two travel lanes and no dedicated right-turn lanes south of Digges Road.<\/p>\n<p>This project\u2019s <a href=\"https:\/\/smartportal.virginiahb2.org\/api\/pdf\/F1-0000000261-R01\" target=\"_blank\" rel=\"noopener\">2015 SMART Scale application<\/a> scored very low for congestion-reduction benefits (<a href=\"https:\/\/smartportal.virginiahb2.org\/api\/pdf\/F1-0000000261-R01\" target=\"_blank\" rel=\"noopener\">see page 8 of the referenced application<\/a>); over 90% of the project&#8217;s SMART Scale score (1.7 out of 1.9) was for &#8220;transportation-efficient land use&#8221; due to its location within a healthcare-focused mixed-use activity center that could be made more walkable and accessible via non-auto travel modes.\u00a0 In other words, SMART Scale funding was awarded because this project is located where enhanced walkabiity and non-vehicle access is important, not to address any traffic-congestion &#8220;deficiency&#8221;.<\/p>\n<p>During the development of the City&#8217;s <a href=\"https:\/\/www.manassasva.gov\/Community%20Development\/transportation\/Transportation%20Master%20Plan%20Report%20-%20City%20of%20Manassas%20-%2020191004_202003181200151504.pdf\" target=\"_blank\" rel=\"noopener\">Transportation Master Plan<\/a> (TMP) in 2019, existing arterial roadways and intersections throughout the City were analyzed by a traffic engineering consultant for traffic congestion, both at present and in the year 2040. \u00a0 As documented on pp. 11-13 of the <a href=\"https:\/\/www.manassasva.gov\/Community Development\/transportation\/Transportation Master Plan Report - City of Manassas - 20191004_202003181200151504.pdf\" target=\"_blank\" rel=\"noopener\">TMP<\/a>, Sudley Road has <strong>no existing traffic congestion problem<\/strong> between Grant Avenue and Godwin Drive, especially in the northbound direction.\u00a0 Furthermore, a similar analysis of roadway and intersection performance in 2040&#8211;in the absence of any currently non-programed transportation improvements&#8211;failed to identify any future traffic congestion problems along this segment of Sudley Road (see pp. 22-23 of the <a href=\"https:\/\/www.manassasva.gov\/Community Development\/transportation\/Transportation Master Plan Report - City of Manassas - 20191004_202003181200151504.pdf\" target=\"_blank\" rel=\"noopener\">TMP<\/a>).<\/p>\n<p>Simply put, the repeatedly claims by City staff that this is project is &#8220;needed&#8221; to relieve traffic congestion and would &#8220;<span dir=\"ltr\">improve the capacity of northbound <\/span><span dir=\"ltr\">Sudley <\/span><span dir=\"ltr\">Road to accommodate vehicular <\/span><span dir=\"ltr\">traffic needs&#8221; is shear nonsense.<\/span><\/p>\n<p><strong>2) The proposed design is blatantly hostile to pedestrians.\u00a0 The project is designed to move motor vehicles at or above 45 MPH and would shift much of that fast traffic close to a narrow, poorly buffered sidewalk.<\/strong><\/p>\n<p>Each travel lane would be 12-feet wide, the standard for Interstate highways.\u00a0 Only one pedestrian crossing signal and marked crosswalk to cross Sudley Road is provided at each signalized intersection, and no mid-block pedestrian crossings or Sudley Road crossings at non-signalized\u00a0 intersections are accommodated. \u00a0\u00a0At many intersections, pedestrian-unfriendly free-flowing right turns are provided for vehicles entering Sudley Road from side streets.\u00a0 Higher vehicle speeds greatly increase the incidence and severity of traffic crashes, especially for pedestrians and other vulnerable road users.<\/p>\n<p>This project will provide only narrow 4- or 5-foot sidewalks that are separated from the roadway with just a two-foot grass strip.\u00a0 Such narrow sidewalks poorly serve two-way foot traffic.\u00a0 Northbound Sudley Road lacks tree shade, urban street furniture, or pedestrian-scale street lights and offers only widely and irregularly spaced highway-style street lights.\u00a0 The design also lacks bus stops and bus shelters, except to preserve one mid-block bus shelter opposite the hospital.\u00a0 This project will not add or upgrade street trees, street lighting, street furniture, or bus stops.\u00a0 Those were not considerations.<\/p>\n<p>The added lanes on Sudley Road at Grant Avenue, Rolling Road, and especially Godwin Drive would make crossing Sudley Road longer and more treacherous than if those lanes were not added.<\/p>\n<p><strong>3)\u00a0 The project design lacks promised and planned bicycle facilities which are both needed and eminently feasible.<\/strong><\/p>\n<p>Although the 2019 Manassas <a href=\"https:\/\/www.manassasva.gov\/Community Development\/transportation\/Transportation Master Plan Report - City of Manassas - 20191004_202003181200151504.pdf\" target=\"_blank\" rel=\"noopener\">Transportation Master Plan<\/a> calls for on-road bike lanes on Sudley Road (see maps on pp. 60-61 of the <a href=\"https:\/\/www.manassasva.gov\/Community Development\/transportation\/Transportation Master Plan Report - City of Manassas - 20191004_202003181200151504.pdf\" target=\"_blank\" rel=\"noopener\">TMP<\/a>), and project staff had promised to study the feasibility of adding a shared-use path (<strong>see page 62 <a href=\"https:\/\/www.manassasva.gov\/Finance\/CIP\/2017\/Transportation%20Projects.pdf\" target=\"_blank\" rel=\"noopener\">here<\/a><\/strong>), the proposed design lacks bicycle accommodations.\u00a0 Furthermore, the project would eliminate the existing, continuous right-turn lanes that currently do accommodate traffic-tolerant northbound bicyclists.\u00a0\u00a0 According to the <a href=\"https:\/\/www.manassasva.gov\/Community%20Development\/transportation\/Appendix%20E.pdf\" target=\"_blank\" rel=\"noopener\"><span dir=\"ltr\">Bicycle <\/span><span dir=\"ltr\">Network <\/span><span dir=\"ltr\">Recommendations <\/span><span dir=\"ltr\">Prioritization <\/span><\/a><span dir=\"ltr\">Matrix, conducted in 2019 as part of the development of the City&#8217;s <a href=\"https:\/\/www.manassasva.gov\/community_development\/planning_and_zoning\/transportation_master_plan.php\" target=\"_blank\" rel=\"noopener\">Transportation Master Plan<\/a> (Appendix E),\u00a0 installing bike lanes on this segment of Sudley Road (Grant Avenue to Godwin Drive) was <strong>tied as the most impactful bicycle network improvement identified for the plan<\/strong>.<\/span><\/p>\n<h4 style=\"text-align: center;\"><strong>Turning Lemons Into Lemonade<\/strong><\/h4>\n<p>Since this project will likely be constructed with minimal design changes, two priority modifications merit immediate consideration.\u00a0 These two alterations would alter the current design by only\u00a0 changing some proposed pavement markings and roadway signs:<\/p>\n<p><strong>1) In lieu of the unnecessary and pedestrian-hostile third northbound travel lane, stripe and sign a continuous right-hand lane dedicated to right turns, buses, bicycles, and perhaps motor scooters. \u00a0<\/strong><\/p>\n<p><strong>2) Reduce the widths of the three 12-foot northbound travel lanes to 11 feet (or 10.5 feet if necessary) and reallocate 5 feet of roadway space to install bike lanes between the right-hand lane (described in #1 above) and the two straight-through travel lanes.\u00a0 <\/strong>To make ordinary striped bike lanes on Sudley Road reasonably safe, all right-turning traffic must be channelized in a right-turn-only lane to the right of the bike lane, and the vehicular design speed should be lowered toward 35 MPH, by narrowing the straight-through travel lanes and not expanding their number.<\/p>\n<p>Of course, only a barrier-separated (&#8220;protected&#8221;) bike lane or an off-roadway shared-use path would provide a low-stress bikeway on Sudley Road serving the &#8220;interested, but concerned&#8221; &#8220;aged-eight-to-eighty&#8221; bicycling public.\u00a0\u00a0 In addition, if striping similar bike lanes along southbound Sudley Road is not presently feasible beyond Digges Road, shared-lane markings (aka sharrows) might be a necessary, if less desirable, southbound alternative.\u00a0 However, neither a shared-use path nor a separated bike lane is politically or practically feasible under the current project, and the perfect should not be the enemy of the good.<\/p>\n<h4 style=\"text-align: center;\"><strong>How You Can Help<\/strong><\/h4>\n<p><strong>Public comments on the design<\/strong> of the Sudley Road Third Lane Project can be submitted<a href=\"https:\/\/form.jotform.com\/211095982766164\" target=\"_blank\" rel=\"noopener\"><strong> at this link<\/strong><\/a>.\u00a0 The previously announced deadline for submitting\u00a0 those comments is <strong>Tuesday, June 1, 2021<\/strong>, but we have requested a two-week extension of that deadline.<\/p>\n<p><strong>There is no deadline to <\/strong><a href=\"https:\/\/www.manassasva.gov\/connect\/mayor_and_council\/mayor_council_directory.php\" target=\"_blank\" rel=\"noopener\"><strong>contact the Manassas Mayor and City Council<\/strong> <\/a>to express your concerns with the project design and\/or the awful public process.\u00a0 The Mayor and City Council are ultimately responsible for setting policies for the City, and they need to hear from their constituents that pedestrian-hostile street designs and the lack of early, robust, and proactive public involvement during the development and funding of City transportation projects are no longer acceptable.<\/p>\n<p>###<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The City of Manassas&#8217; upcoming northbound-only Sudley Road Third Lane Project illustrates how the Manassas City Council has, over many years, allowed pro-motoring locality Engineering\u00a0 and Public Works staff to avoid meaningful public involvement in transportation project development to advance a dismal, anti-pedestrian, largely unnecessary, and counterproductive arterial-road-widening project through a healthcare-focused regionally significant activity [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[164,67,216,111,39,47,149,40,78],"tags":[114,212,233,232,225,207],"class_list":["post-1673","post","type-post","status-publish","format-standard","hentry","category-advocacy","category-bicycling","category-city-of-manassas","category-community-planning","category-pedestrians","category-planning","category-public-hearing","category-sidewalks","category-transportation","tag-city-of-manassas","tag-manassas-city-council","tag-public-involvement","tag-sudley-road","tag-sudley-road-third-lane-project","tag-transportation-planning","post-preview"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"The City of Manassas&#039; upcoming northbound-only Sudley Road Third Lane Project illustrates how the Manassas City Council has, over many years, allowed pro-motoring locality Engineering and Public Works staff to avoid meaningful public involvement in transportation project development to advance a dismal, anti-pedestrian, largely unnecessary, and counterproductive arterial-road-widening project through a healthcare-focused regionally significant activity\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Allen Muchnick\"\/>\n\t<meta name=\"keywords\" content=\"city of manassas,manassas city council,public involvement,sudley road,sudley road third lane project,transportation planning\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.activepw.org\/?p=1673\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.10\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1673#article\",\"name\":\"Manassas\\u2019 Motorist-First Sudley Road Third Lane Project and Its Awful Public Process | Active Prince William\",\"headline\":\"Manassas&#8217; Motorist-First Sudley Road Third Lane Project and Its Awful Public Process\",\"author\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?author=7#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.activepw.org\\\/wp-content\\\/uploads\\\/Sudley-Rd-Third-Lane-Project-Map.jpg\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1673\\\/#articleImage\",\"width\":855,\"height\":509},\"datePublished\":\"2021-05-25T00:24:16-04:00\",\"dateModified\":\"2021-06-02T16:27:14-04:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1673#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1673#webpage\"},\"articleSection\":\"Advocacy, Bicycling, City of Manassas, Community Planning, Pedestrians, Planning, Public Hearing, Sidewalks, Transportation, City of Manassas, Manassas City Council, Public Involvement, Sudley Road, Sudley Road Third Lane Project, Transportation Planning\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1673#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.activepw.org#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.activepw.org\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?cat=47#listItem\",\"name\":\"Planning\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Planning\",\"item\":\"https:\\\/\\\/www.activepw.org\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?cat=111#listItem\",\"name\":\"Community Planning\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.activepw.org#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?cat=111#listItem\",\"position\":3,\"name\":\"Community Planning\",\"item\":\"https:\\\/\\\/www.activepw.org\\\/?cat=111\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1673#listItem\",\"name\":\"Manassas&#8217; Motorist-First Sudley Road Third Lane Project and Its Awful Public Process\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?cat=47#listItem\",\"name\":\"Planning\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1673#listItem\",\"position\":4,\"name\":\"Manassas&#8217; Motorist-First Sudley Road Third Lane Project and Its Awful Public Process\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?cat=111#listItem\",\"name\":\"Community Planning\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/#organization\",\"name\":\"Active Prince William\",\"description\":\"Advancing active mobility in greater Prince William, Virginia\",\"url\":\"https:\\\/\\\/www.activepw.org\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"http:\\\/\\\/activepw.org\\\/wp-content\\\/uploads\\\/cropped-APW-Logo-1.png\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1673\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1673\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?author=7#author\",\"url\":\"https:\\\/\\\/www.activepw.org\\\/?author=7\",\"name\":\"Allen Muchnick\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1673#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f080a947bb0bcc0e479c8e9d1c5393da6b00c5ff3b13fb328a0e6ec4fcd205b0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Allen Muchnick\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1673#webpage\",\"url\":\"https:\\\/\\\/www.activepw.org\\\/?p=1673\",\"name\":\"Manassas\\u2019 Motorist-First Sudley Road Third Lane Project and Its Awful Public Process | Active Prince William\",\"description\":\"The City of Manassas' upcoming northbound-only Sudley Road Third Lane Project illustrates how the Manassas City Council has, over many years, allowed pro-motoring locality Engineering and Public Works staff to avoid meaningful public involvement in transportation project development to advance a dismal, anti-pedestrian, largely unnecessary, and counterproductive arterial-road-widening project through a healthcare-focused regionally significant activity\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1673#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?author=7#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?author=7#author\"},\"datePublished\":\"2021-05-25T00:24:16-04:00\",\"dateModified\":\"2021-06-02T16:27:14-04:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/#website\",\"url\":\"https:\\\/\\\/www.activepw.org\\\/\",\"name\":\"Active Prince William\",\"description\":\"Advancing active mobility in greater Prince William, Virginia\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Manassas\u2019 Motorist-First Sudley Road Third Lane Project and Its Awful Public Process | Active Prince William","description":"The City of Manassas' upcoming northbound-only Sudley Road Third Lane Project illustrates how the Manassas City Council has, over many years, allowed pro-motoring locality Engineering and Public Works staff to avoid meaningful public involvement in transportation project development to advance a dismal, anti-pedestrian, largely unnecessary, and counterproductive arterial-road-widening project through a healthcare-focused regionally significant activity","canonical_url":"https:\/\/www.activepw.org\/?p=1673","robots":"max-image-preview:large","keywords":"city of manassas,manassas city council,public involvement,sudley road,sudley road third lane project,transportation planning","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.activepw.org\/?p=1673#article","name":"Manassas\u2019 Motorist-First Sudley Road Third Lane Project and Its Awful Public Process | Active Prince William","headline":"Manassas&#8217; Motorist-First Sudley Road Third Lane Project and Its Awful Public Process","author":{"@id":"https:\/\/www.activepw.org\/?author=7#author"},"publisher":{"@id":"https:\/\/www.activepw.org\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.activepw.org\/wp-content\/uploads\/Sudley-Rd-Third-Lane-Project-Map.jpg","@id":"https:\/\/www.activepw.org\/?p=1673\/#articleImage","width":855,"height":509},"datePublished":"2021-05-25T00:24:16-04:00","dateModified":"2021-06-02T16:27:14-04:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.activepw.org\/?p=1673#webpage"},"isPartOf":{"@id":"https:\/\/www.activepw.org\/?p=1673#webpage"},"articleSection":"Advocacy, Bicycling, City of Manassas, Community Planning, Pedestrians, Planning, Public Hearing, Sidewalks, Transportation, City of Manassas, Manassas City Council, Public Involvement, Sudley Road, Sudley Road Third Lane Project, Transportation Planning"},{"@type":"BreadcrumbList","@id":"https:\/\/www.activepw.org\/?p=1673#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.activepw.org#listItem","position":1,"name":"Home","item":"https:\/\/www.activepw.org","nextItem":{"@type":"ListItem","@id":"https:\/\/www.activepw.org\/?cat=47#listItem","name":"Planning"}},{"@type":"ListItem","@id":"https:\/\/www.activepw.org\/?cat=47#listItem","position":2,"name":"Planning","item":"https:\/\/www.activepw.org\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.activepw.org\/?cat=111#listItem","name":"Community Planning"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.activepw.org#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.activepw.org\/?cat=111#listItem","position":3,"name":"Community Planning","item":"https:\/\/www.activepw.org\/?cat=111","nextItem":{"@type":"ListItem","@id":"https:\/\/www.activepw.org\/?p=1673#listItem","name":"Manassas&#8217; Motorist-First Sudley Road Third Lane Project and Its Awful Public Process"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.activepw.org\/?cat=47#listItem","name":"Planning"}},{"@type":"ListItem","@id":"https:\/\/www.activepw.org\/?p=1673#listItem","position":4,"name":"Manassas&#8217; Motorist-First Sudley Road Third Lane Project and Its Awful Public Process","previousItem":{"@type":"ListItem","@id":"https:\/\/www.activepw.org\/?cat=111#listItem","name":"Community Planning"}}]},{"@type":"Organization","@id":"https:\/\/www.activepw.org\/#organization","name":"Active Prince William","description":"Advancing active mobility in greater Prince William, Virginia","url":"https:\/\/www.activepw.org\/","logo":{"@type":"ImageObject","url":"http:\/\/activepw.org\/wp-content\/uploads\/cropped-APW-Logo-1.png","@id":"https:\/\/www.activepw.org\/?p=1673\/#organizationLogo"},"image":{"@id":"https:\/\/www.activepw.org\/?p=1673\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/www.activepw.org\/?author=7#author","url":"https:\/\/www.activepw.org\/?author=7","name":"Allen Muchnick","image":{"@type":"ImageObject","@id":"https:\/\/www.activepw.org\/?p=1673#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/f080a947bb0bcc0e479c8e9d1c5393da6b00c5ff3b13fb328a0e6ec4fcd205b0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Allen Muchnick"}},{"@type":"WebPage","@id":"https:\/\/www.activepw.org\/?p=1673#webpage","url":"https:\/\/www.activepw.org\/?p=1673","name":"Manassas\u2019 Motorist-First Sudley Road Third Lane Project and Its Awful Public Process | Active Prince William","description":"The City of Manassas' upcoming northbound-only Sudley Road Third Lane Project illustrates how the Manassas City Council has, over many years, allowed pro-motoring locality Engineering and Public Works staff to avoid meaningful public involvement in transportation project development to advance a dismal, anti-pedestrian, largely unnecessary, and counterproductive arterial-road-widening project through a healthcare-focused regionally significant activity","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.activepw.org\/#website"},"breadcrumb":{"@id":"https:\/\/www.activepw.org\/?p=1673#breadcrumblist"},"author":{"@id":"https:\/\/www.activepw.org\/?author=7#author"},"creator":{"@id":"https:\/\/www.activepw.org\/?author=7#author"},"datePublished":"2021-05-25T00:24:16-04:00","dateModified":"2021-06-02T16:27:14-04:00"},{"@type":"WebSite","@id":"https:\/\/www.activepw.org\/#website","url":"https:\/\/www.activepw.org\/","name":"Active Prince William","description":"Advancing active mobility in greater Prince William, Virginia","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.activepw.org\/#organization"}}]}},"aioseo_meta_data":{"post_id":"1673","title":null,"description":null,"keywords":[],"keyphrases":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":[],"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[],"defaultGraph":"","defaultPostTypeGraph":""},"schema_type":"default","schema_type_options":"{\\\"article\\\":{\\\"articleType\\\":\\\"BlogPosting\\\"},\\\"course\\\":{\\\"name\\\":\\\"\\\",\\\"description\\\":\\\"\\\",\\\"provider\\\":\\\"\\\"},\\\"faq\\\":{\\\"pages\\\":[]},\\\"product\\\":{\\\"reviews\\\":[]},\\\"recipe\\\":{\\\"ingredients\\\":[],\\\"instructions\\\":[],\\\"keywords\\\":[]},\\\"software\\\":{\\\"reviews\\\":[],\\\"operatingSystems\\\":[]},\\\"webPage\\\":{\\\"webPageType\\\":\\\"WebPage\\\"}}","pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2021-05-25 02:30:05","updated":"2025-06-07 04:31:52","primary_term":null,"seo_analyzer_scan_date":null},"_links":{"self":[{"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/posts\/1673","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.activepw.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1673"}],"version-history":[{"count":32,"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/posts\/1673\/revisions"}],"predecessor-version":[{"id":1718,"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/posts\/1673\/revisions\/1718"}],"wp:attachment":[{"href":"https:\/\/www.activepw.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1673"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.activepw.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1673"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.activepw.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1673"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}