{"id":1047,"date":"2017-10-25T23:59:05","date_gmt":"2017-10-26T03:59:05","guid":{"rendered":"https:\/\/www.activepw.org\/?p=1047"},"modified":"2017-10-26T00:05:54","modified_gmt":"2017-10-26T04:05:54","slug":"transform-i-66-outside-the-beltway-design-public-hearings-november-13-14-16","status":"publish","type":"post","link":"https:\/\/www.activepw.org\/?p=1047","title":{"rendered":"Transform I-66 Outside the Beltway Design Public Hearings, November 13, 14 &#038; 16"},"content":{"rendered":"<p style=\"text-align: center;\"><strong>Design Public Hearings<\/strong><br \/>\n<strong>for Transform I-66 Outside\u00a0the Beltway<\/strong><br \/>\n<strong>November 13, 14 and 16, 2017<\/strong><\/p>\n<p>The Virginia Department of Transportation (VDOT), in partnership with I-66 Express Mobility Partners (EMP), will host Design Public Hearings on the Transform 66 Outside the Beltway Project regarding plans for the 22.5 mile corridor from I-495 to University Boulevard in Gainesville.<\/p>\n<p><strong><em>This will be our final opportunity to review and comment on the proposed design of the I-66 Trail, between Gallows Rd. in Dunn Loring and University Blvd. &amp; Rte 29 in Gainesville.<\/em> <\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Public Hearing Dates and Locations<\/strong><\/p>\n<p>All hearing times are from 6:00 p.m. until 8:30 p.m.<br \/>\nA formal presentation will begin at 7 p.m., followed by a public comment period.<\/p>\n<p><strong>Monday, November 13, 2017<\/strong><br \/>\n<strong>for project segment 3 from Route 50 to I-495<\/strong><br \/>\n<strong>Oakton High School Cafeteria <a href=\"https:\/\/maps.google.com\/?q=2900+Sutton+Road,+Vienna,+VA+22181&amp;entry=gmail&amp;source=g\">2900 Sutton Road, Vienna, VA 22181<\/a><\/strong><\/p>\n<p style=\"text-align: left;\"><strong>Tuesday, November 14, 2017<\/strong><br \/>\n<strong>for project segment 2 from Route 29 in Centreville to Route 50<\/strong><br \/>\n<strong>Stone Middle School Cafeteria <a href=\"https:\/\/maps.google.com\/?q=5500+Sully+Park+Drive,+Centreville,+VA+20120&amp;entry=gmail&amp;source=g\">5500 Sully Park Drive, Centreville, VA 20120<\/a><\/strong><\/p>\n<p style=\"text-align: left;\"><strong>Thursday, November 16, 2017<\/strong><br \/>\n<strong>for project segment 1 from Gainesville to Route 29 in Centreville<\/strong><br \/>\n<strong>Piney Branch Elementary School Cafeteria\/Gym <a href=\"https:\/\/maps.google.com\/?q=8301+Linton+Hall+Road,+Bristow,+VA+20136&amp;entry=gmail&amp;source=g\">8301 Linton Hall Road, Bristow, VA 20136<\/a><\/strong><\/p>\n<p><strong>Details:<\/strong><\/p>\n<ul>\n<li>View design plans and learn more about the proposed improvements<\/li>\n<li>Discuss your questions with staff during the open house<\/li>\n<li>Attend the formal presentation, followed by a public comment period<\/li>\n<li>Provide oral and\/or written comments<\/li>\n<li><strong><em>Comment period through November 29, 2017<\/em><\/strong><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Design Public Hearings for Transform I-66 Outside\u00a0the Beltway November 13, 14 and 16, 2017 The Virginia Department of Transportation (VDOT), in partnership with I-66 Express Mobility Partners (EMP), will host Design Public Hearings on the Transform 66 Outside the Beltway Project regarding plans for the 22.5 mile corridor from I-495 to University Boulevard in Gainesville. [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[164,67,84,66,69,39,149,22,78,68],"tags":[178,179,177],"class_list":["post-1047","post","type-post","status-publish","format-standard","hentry","category-advocacy","category-bicycling","category-bike-commuting","category-bike-trails","category-interstate-66","category-pedestrians","category-public-hearing","category-transit","category-transportation","category-walking","tag-design-public-hearing","tag-i-66-trail","tag-i-66-widening","post-preview"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/posts\/1047","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.activepw.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1047"}],"version-history":[{"count":3,"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/posts\/1047\/revisions"}],"predecessor-version":[{"id":1050,"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/posts\/1047\/revisions\/1050"}],"wp:attachment":[{"href":"https:\/\/www.activepw.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1047"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.activepw.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1047"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.activepw.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1047"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}