{"id":1047,"date":"2017-10-25T23:59:05","date_gmt":"2017-10-26T03:59:05","guid":{"rendered":"https:\/\/www.activepw.org\/?p=1047"},"modified":"2017-10-26T00:05:54","modified_gmt":"2017-10-26T04:05:54","slug":"transform-i-66-outside-the-beltway-design-public-hearings-november-13-14-16","status":"publish","type":"post","link":"https:\/\/www.activepw.org\/?p=1047","title":{"rendered":"Transform I-66 Outside the Beltway Design Public Hearings, November 13, 14 &#038; 16"},"content":{"rendered":"<p style=\"text-align: center;\"><strong>Design Public Hearings<\/strong><br \/>\n<strong>for Transform I-66 Outside\u00a0the Beltway<\/strong><br \/>\n<strong>November 13, 14 and 16, 2017<\/strong><\/p>\n<p>The Virginia Department of Transportation (VDOT), in partnership with I-66 Express Mobility Partners (EMP), will host Design Public Hearings on the Transform 66 Outside the Beltway Project regarding plans for the 22.5 mile corridor from I-495 to University Boulevard in Gainesville.<\/p>\n<p><strong><em>This will be our final opportunity to review and comment on the proposed design of the I-66 Trail, between Gallows Rd. in Dunn Loring and University Blvd. &amp; Rte 29 in Gainesville.<\/em> <\/strong><\/p>\n<p style=\"text-align: center;\"><strong>Public Hearing Dates and Locations<\/strong><\/p>\n<p>All hearing times are from 6:00 p.m. until 8:30 p.m.<br \/>\nA formal presentation will begin at 7 p.m., followed by a public comment period.<\/p>\n<p><strong>Monday, November 13, 2017<\/strong><br \/>\n<strong>for project segment 3 from Route 50 to I-495<\/strong><br \/>\n<strong>Oakton High School Cafeteria <a href=\"https:\/\/maps.google.com\/?q=2900+Sutton+Road,+Vienna,+VA+22181&amp;entry=gmail&amp;source=g\">2900 Sutton Road, Vienna, VA 22181<\/a><\/strong><\/p>\n<p style=\"text-align: left;\"><strong>Tuesday, November 14, 2017<\/strong><br \/>\n<strong>for project segment 2 from Route 29 in Centreville to Route 50<\/strong><br \/>\n<strong>Stone Middle School Cafeteria <a href=\"https:\/\/maps.google.com\/?q=5500+Sully+Park+Drive,+Centreville,+VA+20120&amp;entry=gmail&amp;source=g\">5500 Sully Park Drive, Centreville, VA 20120<\/a><\/strong><\/p>\n<p style=\"text-align: left;\"><strong>Thursday, November 16, 2017<\/strong><br \/>\n<strong>for project segment 1 from Gainesville to Route 29 in Centreville<\/strong><br \/>\n<strong>Piney Branch Elementary School Cafeteria\/Gym <a href=\"https:\/\/maps.google.com\/?q=8301+Linton+Hall+Road,+Bristow,+VA+20136&amp;entry=gmail&amp;source=g\">8301 Linton Hall Road, Bristow, VA 20136<\/a><\/strong><\/p>\n<p><strong>Details:<\/strong><\/p>\n<ul>\n<li>View design plans and learn more about the proposed improvements<\/li>\n<li>Discuss your questions with staff during the open house<\/li>\n<li>Attend the formal presentation, followed by a public comment period<\/li>\n<li>Provide oral and\/or written comments<\/li>\n<li><strong><em>Comment period through November 29, 2017<\/em><\/strong><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Design Public Hearings for Transform I-66 Outside\u00a0the Beltway November 13, 14 and 16, 2017 The Virginia Department of Transportation (VDOT), in partnership with I-66 Express Mobility Partners (EMP), will host Design Public Hearings on the Transform 66 Outside the Beltway Project regarding plans for the 22.5 mile corridor from I-495 to University Boulevard in Gainesville. [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[164,67,84,66,69,39,149,22,78,68],"tags":[178,179,177],"class_list":["post-1047","post","type-post","status-publish","format-standard","hentry","category-advocacy","category-bicycling","category-bike-commuting","category-bike-trails","category-interstate-66","category-pedestrians","category-public-hearing","category-transit","category-transportation","category-walking","tag-design-public-hearing","tag-i-66-trail","tag-i-66-widening","post-preview"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"Design Public Hearings for Transform I-66 Outside the Beltway November 13, 14 and 16, 2017 The Virginia Department of Transportation (VDOT), in partnership with I-66 Express Mobility Partners (EMP), will host Design Public Hearings on the Transform 66 Outside the Beltway Project regarding plans for the 22.5 mile corridor from I-495 to University Boulevard in Gainesville.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Allen Muchnick\"\/>\n\t<meta name=\"keywords\" content=\"design public hearing,i-66 trail,i-66 widening\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.activepw.org\/?p=1047\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.10\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1047#article\",\"name\":\"Transform I-66 Outside the Beltway Design Public Hearings, November 13, 14 & 16 | Active Prince William\",\"headline\":\"Transform I-66 Outside the Beltway Design Public Hearings, November 13, 14 &#038; 16\",\"author\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?author=7#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"http:\\\/\\\/activepw.org\\\/wp-content\\\/uploads\\\/cropped-APW-Logo-1.png\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/#articleImage\"},\"datePublished\":\"2017-10-25T23:59:05-04:00\",\"dateModified\":\"2017-10-26T00:05:54-04:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1047#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1047#webpage\"},\"articleSection\":\"Advocacy, Bicycling, Bike Commuting, Bike Trails, Interstate 66, Pedestrians, Public Hearing, Transit, Transportation, Walking, Design Public Hearing, I-66 Trail, I-66 Widening\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1047#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.activepw.org#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.activepw.org\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?cat=22#listItem\",\"name\":\"Transit\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?cat=22#listItem\",\"position\":2,\"name\":\"Transit\",\"item\":\"https:\\\/\\\/www.activepw.org\\\/?cat=22\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1047#listItem\",\"name\":\"Transform I-66 Outside the Beltway Design Public Hearings, November 13, 14 &#038; 16\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.activepw.org#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1047#listItem\",\"position\":3,\"name\":\"Transform I-66 Outside the Beltway Design Public Hearings, November 13, 14 &#038; 16\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?cat=22#listItem\",\"name\":\"Transit\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/#organization\",\"name\":\"Active Prince William\",\"description\":\"Advancing active mobility in greater Prince William, Virginia\",\"url\":\"https:\\\/\\\/www.activepw.org\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"http:\\\/\\\/activepw.org\\\/wp-content\\\/uploads\\\/cropped-APW-Logo-1.png\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1047\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1047\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?author=7#author\",\"url\":\"https:\\\/\\\/www.activepw.org\\\/?author=7\",\"name\":\"Allen Muchnick\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1047#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f080a947bb0bcc0e479c8e9d1c5393da6b00c5ff3b13fb328a0e6ec4fcd205b0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Allen Muchnick\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1047#webpage\",\"url\":\"https:\\\/\\\/www.activepw.org\\\/?p=1047\",\"name\":\"Transform I-66 Outside the Beltway Design Public Hearings, November 13, 14 & 16 | Active Prince William\",\"description\":\"Design Public Hearings for Transform I-66 Outside the Beltway November 13, 14 and 16, 2017 The Virginia Department of Transportation (VDOT), in partnership with I-66 Express Mobility Partners (EMP), will host Design Public Hearings on the Transform 66 Outside the Beltway Project regarding plans for the 22.5 mile corridor from I-495 to University Boulevard in Gainesville.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?p=1047#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?author=7#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/?author=7#author\"},\"datePublished\":\"2017-10-25T23:59:05-04:00\",\"dateModified\":\"2017-10-26T00:05:54-04:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.activepw.org\\\/#website\",\"url\":\"https:\\\/\\\/www.activepw.org\\\/\",\"name\":\"Active Prince William\",\"description\":\"Advancing active mobility in greater Prince William, Virginia\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.activepw.org\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Transform I-66 Outside the Beltway Design Public Hearings, November 13, 14 & 16 | Active Prince William","description":"Design Public Hearings for Transform I-66 Outside the Beltway November 13, 14 and 16, 2017 The Virginia Department of Transportation (VDOT), in partnership with I-66 Express Mobility Partners (EMP), will host Design Public Hearings on the Transform 66 Outside the Beltway Project regarding plans for the 22.5 mile corridor from I-495 to University Boulevard in Gainesville.","canonical_url":"https:\/\/www.activepw.org\/?p=1047","robots":"max-image-preview:large","keywords":"design public hearing,i-66 trail,i-66 widening","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.activepw.org\/?p=1047#article","name":"Transform I-66 Outside the Beltway Design Public Hearings, November 13, 14 & 16 | Active Prince William","headline":"Transform I-66 Outside the Beltway Design Public Hearings, November 13, 14 &#038; 16","author":{"@id":"https:\/\/www.activepw.org\/?author=7#author"},"publisher":{"@id":"https:\/\/www.activepw.org\/#organization"},"image":{"@type":"ImageObject","url":"http:\/\/activepw.org\/wp-content\/uploads\/cropped-APW-Logo-1.png","@id":"https:\/\/www.activepw.org\/#articleImage"},"datePublished":"2017-10-25T23:59:05-04:00","dateModified":"2017-10-26T00:05:54-04:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.activepw.org\/?p=1047#webpage"},"isPartOf":{"@id":"https:\/\/www.activepw.org\/?p=1047#webpage"},"articleSection":"Advocacy, Bicycling, Bike Commuting, Bike Trails, Interstate 66, Pedestrians, Public Hearing, Transit, Transportation, Walking, Design Public Hearing, I-66 Trail, I-66 Widening"},{"@type":"BreadcrumbList","@id":"https:\/\/www.activepw.org\/?p=1047#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.activepw.org#listItem","position":1,"name":"Home","item":"https:\/\/www.activepw.org","nextItem":{"@type":"ListItem","@id":"https:\/\/www.activepw.org\/?cat=22#listItem","name":"Transit"}},{"@type":"ListItem","@id":"https:\/\/www.activepw.org\/?cat=22#listItem","position":2,"name":"Transit","item":"https:\/\/www.activepw.org\/?cat=22","nextItem":{"@type":"ListItem","@id":"https:\/\/www.activepw.org\/?p=1047#listItem","name":"Transform I-66 Outside the Beltway Design Public Hearings, November 13, 14 &#038; 16"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.activepw.org#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.activepw.org\/?p=1047#listItem","position":3,"name":"Transform I-66 Outside the Beltway Design Public Hearings, November 13, 14 &#038; 16","previousItem":{"@type":"ListItem","@id":"https:\/\/www.activepw.org\/?cat=22#listItem","name":"Transit"}}]},{"@type":"Organization","@id":"https:\/\/www.activepw.org\/#organization","name":"Active Prince William","description":"Advancing active mobility in greater Prince William, Virginia","url":"https:\/\/www.activepw.org\/","logo":{"@type":"ImageObject","url":"http:\/\/activepw.org\/wp-content\/uploads\/cropped-APW-Logo-1.png","@id":"https:\/\/www.activepw.org\/?p=1047\/#organizationLogo"},"image":{"@id":"https:\/\/www.activepw.org\/?p=1047\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/www.activepw.org\/?author=7#author","url":"https:\/\/www.activepw.org\/?author=7","name":"Allen Muchnick","image":{"@type":"ImageObject","@id":"https:\/\/www.activepw.org\/?p=1047#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/f080a947bb0bcc0e479c8e9d1c5393da6b00c5ff3b13fb328a0e6ec4fcd205b0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Allen Muchnick"}},{"@type":"WebPage","@id":"https:\/\/www.activepw.org\/?p=1047#webpage","url":"https:\/\/www.activepw.org\/?p=1047","name":"Transform I-66 Outside the Beltway Design Public Hearings, November 13, 14 & 16 | Active Prince William","description":"Design Public Hearings for Transform I-66 Outside the Beltway November 13, 14 and 16, 2017 The Virginia Department of Transportation (VDOT), in partnership with I-66 Express Mobility Partners (EMP), will host Design Public Hearings on the Transform 66 Outside the Beltway Project regarding plans for the 22.5 mile corridor from I-495 to University Boulevard in Gainesville.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.activepw.org\/#website"},"breadcrumb":{"@id":"https:\/\/www.activepw.org\/?p=1047#breadcrumblist"},"author":{"@id":"https:\/\/www.activepw.org\/?author=7#author"},"creator":{"@id":"https:\/\/www.activepw.org\/?author=7#author"},"datePublished":"2017-10-25T23:59:05-04:00","dateModified":"2017-10-26T00:05:54-04:00"},{"@type":"WebSite","@id":"https:\/\/www.activepw.org\/#website","url":"https:\/\/www.activepw.org\/","name":"Active Prince William","description":"Advancing active mobility in greater Prince William, Virginia","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.activepw.org\/#organization"}}]}},"aioseo_meta_data":{"post_id":"1047","title":null,"description":null,"keywords":null,"keyphrases":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[],"defaultGraph":"","defaultPostTypeGraph":""},"schema_type":null,"schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2021-01-22 00:51:34","updated":"2025-06-06 22:25:52","primary_term":null,"seo_analyzer_scan_date":null},"_links":{"self":[{"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/posts\/1047","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.activepw.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1047"}],"version-history":[{"count":3,"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/posts\/1047\/revisions"}],"predecessor-version":[{"id":1050,"href":"https:\/\/www.activepw.org\/index.php?rest_route=\/wp\/v2\/posts\/1047\/revisions\/1050"}],"wp:attachment":[{"href":"https:\/\/www.activepw.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1047"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.activepw.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1047"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.activepw.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1047"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}